CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
pseudoSeries/aim/
aim-200-1-6-4.xml

Jump to solvers results

General information on the benchmark

NamepseudoSeries/aim/
aim-200-1-6-4.xml
MD5SUM53aed87aeb9458fa17e7eb4bb86e0c8a
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.213967
SatisfiableYES
(Un)Satisfiability was provedYES
Number of variables400
Number of constraints520
Maximum constraint arity3
Maximum domain size2
Number of constraints which are defined in extension0
Number of constraints which are defined in intension520
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
CSPtoSAT+minisat 0.3213452SAT 0.213967 0.216679
sugar 0.40213451SAT 1.1 1.3529
galacJ beta 1213441SAT 1.9607 2.01637
galac 1213446SAT 2.06968 2.32468
sat4jCSP 1.7 RC BF3213448SAT 2.6246 2.73311
SAT4JCSP-CACHED 1.7 RC BF3213447SAT 3.02254 1.94002
Abscon 109 ESAC213442SAT 4.75328 4.84133
Abscon 109 AC213443SAT 11.8302 11.8932
Tramontane 2006-12-04213450SAT 12.3971 12.4252
CSP4J - Combo 2006-12-19213444SAT 49.0225 49.5074
CSP4J - MAC 2006-12-19213445SAT 49.3235 49.7887
CSP4J - MAC 2007-01-16271090SAT 57.6112 57.9212
Mistral 2006-12-04213449SAT 102.458 102.608
BPrologCSPSolver70a 2006-12-13213440? (TO) 1800.1 1807.48