CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
pseudoSeries/aim/
aim-100-6-0-2.xml

Jump to solvers results

General information on the benchmark

NamepseudoSeries/aim/
aim-100-6-0-2.xml
MD5SUMad4072d32134eceab4aaf80b59192b93
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.104983
SatisfiableYES
(Un)Satisfiability was provedYES
Number of variables200
Number of constraints700
Maximum constraint arity3
Maximum domain size2
Number of constraints which are defined in extension0
Number of constraints which are defined in intension700
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Tramontane 2006-12-04213320SAT 0.104983 0.113878
CSPtoSAT+minisat 0.3213322SAT 0.118981 0.121641
Mistral 2006-12-04213319SAT 0.12298 0.129307
BPrologCSPSolver70a 2006-12-13213310SAT 0.166973 0.170073
sugar 0.40213321SAT 1.03 1.23666
Abscon 109 AC213313SAT 1.13683 1.178
Abscon 109 ESAC213312SAT 1.24681 1.27689
CSP4J - Combo 2006-12-19213314SAT 2.01769 2.0689
galacJ beta 1213311SAT 2.18667 2.28846
galac 1213316SAT 2.21866 2.28739
CSP4J - MAC 2006-12-19213315SAT 2.36164 2.42483
CSP4J - MAC 2007-01-16271080SAT 2.50062 2.5366
sat4jCSP 1.7 RC BF3213318SAT 2.91256 1.98312
SAT4JCSP-CACHED 1.7 RC BF3213317SAT 3.23551 2.03513