CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
pseudoSeries/aim/
aim-200-3-4-3.xml

Jump to solvers results

General information on the benchmark

NamepseudoSeries/aim/
aim-200-3-4-3.xml
MD5SUM92507409788ebee6c63759c5a15559cf
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.656899
SatisfiableYES
(Un)Satisfiability was provedYES
Number of variables400
Number of constraints880
Maximum constraint arity3
Maximum domain size2
Number of constraints which are defined in extension0
Number of constraints which are defined in intension880
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
CSPtoSAT+minisat 0.3212984SAT 0.656899 0.660597
sugar 0.40212983SAT 1.22081 1.35608
galacJ beta 1212973SAT 2.53161 2.60009
galac 1212978SAT 2.66159 2.85785
sat4jCSP 1.7 RC BF3212980SAT 3.09153 3.14139
SAT4JCSP-CACHED 1.7 RC BF3212979SAT 3.41648 3.34552
Abscon 109 ESAC212974SAT 9.07162 9.25478
Tramontane 2006-12-04212982SAT 14.1748 14.3072
Abscon 109 AC212975SAT 19.2101 19.2893
CSP4J - MAC 2006-12-19212977SAT 41.7137 41.9948
CSP4J - MAC 2007-01-16271054SAT 42.6925 43.1527
Mistral 2006-12-04212981SAT 240.941 245.42
CSP4J - Combo 2006-12-19212976SAT 474.981 476.113
BPrologCSPSolver70a 2006-12-13212972? (TO) 1800.08 1801.74