CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
allIntervalSeries/
series-20.xml

Jump to solvers results

General information on the benchmark

NameallIntervalSeries/
series-20.xml
MD5SUMf051ba5be31bddb148dcd9a1b4764b6e
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.030995
SatisfiableYES
(Un)Satisfiability was provedYES
Number of variables39
Number of constraints380
Maximum constraint arity3
Maximum domain size20
Number of constraints which are defined in extension0
Number of constraints which are defined in intension380
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
BPrologCSPSolver70a 2006-12-13199501SAT 0.030995 0.0371569
Abscon 109 ESAC199503SAT 0.926858 0.966206
Tramontane 2006-12-04199511SAT 207.504 209.46
sugar 0.40199512SAT 650.79 654.705
Mistral 2006-12-04199510? (TO) 1800.03 1813.71
CSP4J - Combo 2006-12-19199505? (TO) 1800.05 1807.55
galac 1199507? (TO) 1800.05 1802.24
galacJ beta 1199502? (TO) 1800.05 1805.89
CSP4J - MAC 2006-12-19199506? (TO) 1800.06 1802.36
Abscon 109 AC199504? (TO) 1800.08 1800.66
CSP4J - MAC 2007-01-16270208? (TO) 1800.11 1801.18
CSPtoSAT+minisat 0.3199513? (TO) 1800.11 1806.96
SAT4JCSP-CACHED 1.7 RC BF3199508? (TO) 1800.19 1799.21
sat4jCSP 1.7 RC BF3199509? (TO) 1800.21 1809.18