CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
jobShop/jobShop-enddr1/
enddr1-10-by-5-4.xml

Jump to solvers results

General information on the benchmark

NamejobShop/jobShop-enddr1/
enddr1-10-by-5-4.xml
MD5SUMf9d386c959107bd654add9b2b7f22608
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.033994
SatisfiableYES
(Un)Satisfiability was provedYES
Number of variables50
Number of constraints265
Maximum constraint arity2
Maximum domain size123
Number of constraints which are defined in extension0
Number of constraints which are defined in intension265
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Tramontane 2006-12-04198199SAT 0.033994 0.0435051
BPrologCSPSolver70a 2006-12-13198186SAT 0.035994 0.0386251
Mistral 2006-12-04198198SAT 0.037993 0.0680859
buggy_2_5 2007-01-08198197SAT 0.332948 0.370794
VALCSP 3.0198193SAT 0.722889 0.72583
VALCSP 3.1268099SAT 0.725888 0.726557
sugar 0.40198200SAT 1.07 1.26577
Abscon 109 AC198189SAT 1.67074 1.69387
Abscon 109 ESAC198188SAT 1.68174 1.74997
CSP4J - Combo 2006-12-19198190SAT 2.45363 2.49528
CSP4J - MAC 2007-01-16270126SAT 3.41048 3.49092
CSP4J - MAC 2006-12-19198191SAT 3.48947 3.58099
buggy_2_5_s 2007-01-08198196SAT 4.86026 4.89838
sat4jCSP 1.7 RC BF3198195SAT 11.9082 10.65
SAT4JCSP-CACHED 1.7 RC BF3198194SAT 14.5488 12.4331
galacJ beta 1198187SAT 26.583 26.7238
galac 1198192SAT 45.2761 45.7306
CSPtoSAT+minisat 0.3198201? (TO) 1800.01 1802.07