CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
dimacs/pret/
pret-150-25_ext.xml

Jump to solvers results

General information on the benchmark

Namedimacs/pret/
pret-150-25_ext.xml
MD5SUM7942e547e6f15972e65c0d137b735236
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.044992
SatisfiableNO
(Un)Satisfiability was proved
Number of variables150
Number of constraints100
Maximum constraint arity3
Maximum domain size2
Number of constraints which are defined in extension100
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
CSPtoSAT+minisat 0.3241956UNSAT 0.044992 0.0535139
sugar 0.40241955UNSAT 0.589909 0.992619
galacJ beta 1241939UNSAT 0.806876 0.863276
galac 1241950UNSAT 0.821874 0.879392
SAT4JCSP-CACHED 1.7 RC BF3241951UNSAT 1.51377 1.14278
sat4jCSP 1.7 RC BF3241952UNSAT 1.59776 1.14178
Abscon 109 AC241947UNSAT 5.9371 5.96811
Abscon 109 ESAC241946UNSAT 13.28 13.3221
Mistral 2006-12-04241953? (TO) 1800.02 1800.52
CSP4J - Combo 2006-12-19241948? (TO) 1800.03 1808.73
CSP4J - MAC 2006-12-19241949? (TO) 1800.04 1810.09
Tramontane 2006-12-04241954? (TO) 1800.07 1812.13
CSP4J - MAC 2007-01-16272727? (TO) 1800.07 1801.1
BPrologCSPSolver70a 2006-12-13241937? (TO) 1800.08 1811.55