CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
dimacs/pret/
pret-150-75_ext.xml

Jump to solvers results

General information on the benchmark

Namedimacs/pret/
pret-150-75_ext.xml
MD5SUM8c16a1ce741b5e4e319f46b3cb8ec761
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.045992
SatisfiableNO
(Un)Satisfiability was proved
Number of variables150
Number of constraints100
Maximum constraint arity3
Maximum domain size2
Number of constraints which are defined in extension100
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
CSPtoSAT+minisat 0.3241820UNSAT 0.045992 0.0473649
sugar 0.40241819UNSAT 0.077987 0.907852
galac 1241814UNSAT 0.798877 0.819882
galacJ beta 1241803UNSAT 0.807876 0.854926
SAT4JCSP-CACHED 1.7 RC BF3241815UNSAT 1.45978 1.05141
sat4jCSP 1.7 RC BF3241816UNSAT 1.48477 1.0916
Abscon 109 AC241811UNSAT 8.82766 8.94542
Abscon 109 ESAC241810UNSAT 83.7263 84.1163
BPrologCSPSolver70a 2006-12-13241801? (TO) 1800.02 1802.48
Tramontane 2006-12-04241818? (TO) 1800.02 1814.8
CSP4J - MAC 2006-12-19241813? (TO) 1800.03 1800.84
Mistral 2006-12-04241817? (TO) 1800.06 1800.76
CSP4J - Combo 2006-12-19241812? (TO) 1800.06 1814.97
CSP4J - MAC 2007-01-16272720? (TO) 1800.08 1812.16