CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
jobShop/jobShop-e0ddr2/
e0ddr2-10-by-5-7.xml

Jump to solvers results

General information on the benchmark

NamejobShop/jobShop-e0ddr2/
e0ddr2-10-by-5-7.xml
MD5SUM44053183196422f2b6699935dffba18f
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.036993
SatisfiableYES
(Un)Satisfiability was provedYES
Number of variables50
Number of constraints265
Maximum constraint arity2
Maximum domain size133
Number of constraints which are defined in extension0
Number of constraints which are defined in intension265
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 2006-12-04221976SAT 0.036993 0.045973
Tramontane 2006-12-04221977SAT 0.038993 0.040295
buggy_2_5 2007-01-08221975SAT 0.380941 0.387441
VALCSP 3.1268853SAT 0.904862 0.906512
VALCSP 3.0221971SAT 0.933857 0.945827
sugar 0.40221978SAT 1.02 1.1648
Abscon 109 ESAC221966SAT 1.80772 1.88795
Abscon 109 AC221967SAT 1.9697 2.01597
CSP4J - Combo 2006-12-19221968SAT 2.82057 2.85116
CSP4J - MAC 2007-01-16271639SAT 3.36349 3.41368
CSP4J - MAC 2006-12-19221969SAT 3.88441 3.94885
buggy_2_5_s 2007-01-08221974SAT 4.94825 4.99533
sat4jCSP 1.7 RC BF3221973SAT 14.8947 14.2909
SAT4JCSP-CACHED 1.7 RC BF3221972SAT 18.5682 15.9625
galac 1221970SAT 56.8574 57.1147
galacJ beta 1221965SAT 113.46 114.181
BPrologCSPSolver70a 2006-12-13221964SAT 899.85 900.593
CSPtoSAT+minisat 0.3221979? (TO) 1800.08 1813.58