CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
pseudoSeries/
primesDimacs/f600.xml

Jump to solvers results

General information on the benchmark

NamepseudoSeries/
primesDimacs/f600.xml
MD5SUMeaafb6d59875b3b88c054bc279abccfd
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmark
Best CPU time to get the best result obtained on this benchmark
Satisfiable
(Un)Satisfiability was proved
Number of variables1200
Number of constraints3150
Maximum constraint arity3
Maximum domain size2
Number of constraints which are defined in extension0
Number of constraints which are defined in intension3150
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
CSP4J - Combo 2006-12-19212729? (TO) 1800.01 1815.6
Tramontane 2006-12-04212735? (TO) 1800.03 1811.69
CSP4J - MAC 2007-01-16271035? (TO) 1800.03 1807.14
galacJ beta 1212726? (TO) 1800.05 1808.76
Mistral 2006-12-04212734? (TO) 1800.06 1805.51
CSPtoSAT+minisat 0.3212737? (TO) 1800.06 1805.38
CSP4J - MAC 2006-12-19212730? (TO) 1800.07 1811.92
SAT4JCSP-CACHED 1.7 RC BF3212732? (TO) 1800.08 1809.48
BPrologCSPSolver70a 2006-12-13212725? (TO) 1800.1 1802.85
sugar 0.40212736? (TO) 1800.12 1800.81
galac 1212731? (TO) 1800.12 1813.97
sat4jCSP 1.7 RC BF3212733? (TO) 1800.15 1805.87
Abscon 109 ESAC212727? (TO) 1800.18 1802.39
Abscon 109 AC212728? (TO) 1800.18 1815.24