CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
jobShop/jobShop-enddr1/
enddr1-10-by-5-3.xml

Jump to solvers results

General information on the benchmark

NamejobShop/jobShop-enddr1/
enddr1-10-by-5-3.xml
MD5SUM240d1bae6d87637b9191a86f7c39bde6
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.037993
SatisfiableYES
(Un)Satisfiability was provedYES
Number of variables50
Number of constraints265
Maximum constraint arity2
Maximum domain size126
Number of constraints which are defined in extension0
Number of constraints which are defined in intension265
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
BPrologCSPSolver70a 2006-12-13198202SAT 0.037993 0.0388731
Mistral 2006-12-04198214SAT 0.060989 0.062393
Tramontane 2006-12-04198215SAT 0.072988 0.0754919
buggy_2_5 2007-01-08198213SAT 0.337948 0.34696
VALCSP 3.0198209SAT 0.682895 0.68924
VALCSP 3.1268100SAT 0.683895 0.704805
sugar 0.40198216SAT 0.93 1.4272
Abscon 109 ESAC198204SAT 1.68374 1.75214
Abscon 109 AC198205SAT 1.89671 1.93205
CSP4J - MAC 2006-12-19198207SAT 3.38149 3.44927
CSP4J - MAC 2007-01-16270127SAT 3.47047 3.54528
CSP4J - Combo 2006-12-19198206SAT 3.9164 3.94163
buggy_2_5_s 2007-01-08198212SAT 4.31734 4.33889
sat4jCSP 1.7 RC BF3198211SAT 12.3181 12.4921
SAT4JCSP-CACHED 1.7 RC BF3198210SAT 15.2107 14.7352
galacJ beta 1198203SAT 26.7829 27.0603
galac 1198208SAT 44.2643 44.4088
CSPtoSAT+minisat 0.3198217? (TO) 1800.07 1814.08