CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
primes/primes-20/
primes-20-80-3-5.xml

Jump to solvers results

General information on the benchmark

Nameprimes/primes-20/
primes-20-80-3-5.xml
MD5SUMa4d92b95484173c470960737f3393782
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark144.365
SatisfiableYES
(Un)Satisfiability was proved
Number of variables100
Number of constraints80
Maximum constraint arity8
Maximum domain size70
Number of constraints which are defined in extension0
Number of constraints which are defined in intension80
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
BPrologCSPSolver70a 2006-12-13249582SAT 144.365 145.599
SAT4JCSP-CACHED 1.7 RC BF3249589? (MO) 44.6262 44.5996
sat4jCSP 1.7 RC BF3249590? (MO) 68.8725 56.4723
CSP4J - MAC 2006-12-19249587? (TO) 1800 1806.42
galac 1249588? (TO) 1800.01 1807.47
CSP4J - Combo 2006-12-19249586? (TO) 1800.05 1801.2
Abscon 109 ESAC249584? (TO) 1800.07 1812.38
CSP4J - MAC 2007-01-16273087? (TO) 1800.09 1801.01
CSPtoSAT+minisat 0.3249594? (TO) 1800.09 1803.43
galacJ beta 1249583? (TO) 1800.1 1811.86
Abscon 109 AC249585? (TO) 1800.13 1805.22
sugar 0.40249593? (TO) 1803.22 1915.77
Tramontane 2006-12-04249592Signal 0.036993 0.0571289
Mistral 2006-12-04249591Signal 0.042993 0.0523651