CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
primes/primes-25/
primes-25-80-2-5.xml

Jump to solvers results

General information on the benchmark

Nameprimes/primes-25/
primes-25-80-2-5.xml
MD5SUM042ca10c81b98ca83b42be887d4820d2
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.029994
SatisfiableYES
(Un)Satisfiability was proved
Number of variables100
Number of constraints80
Maximum constraint arity7
Maximum domain size96
Number of constraints which are defined in extension0
Number of constraints which are defined in intension80
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
BPrologCSPSolver70a 2006-12-13248854SAT 0.029994 0.036027
Abscon 109 ESAC248856SAT 4.20536 4.34117
Abscon 109 AC248857SAT 5.09822 5.13615
SAT4JCSP-CACHED 1.7 RC BF3248861? (MO) 45.6171 45.5199
sat4jCSP 1.7 RC BF3248862? (MO) 71.0202 69.1783
CSP4J - Combo 2006-12-19248858? (TO) 0.004998 1802.27
galac 1248860? (TO) 1800.01 1813.91
CSP4J - MAC 2007-01-16273031? (TO) 1800.03 1801.96
CSPtoSAT+minisat 0.3248866? (TO) 1800.05 1807.19
galacJ beta 1248855? (TO) 1800.08 1804.08
CSP4J - MAC 2006-12-19248859? (TO) 1800.09 1808.67
sugar 0.40248865? (TO) 1803.18 2349.55
Mistral 2006-12-04248863Signal 0.035994 0.0401891
Tramontane 2006-12-04248864Signal 0.036993 0.0442621