Name | /PARTIAL-BIGINT-LIN/wcsp/pedigree/ normalized-sheep4r-4-1_wcsp.wbo |
MD5SUM | 9484feda1dfd442233b4ec59a851c185 |
Bench Category | PARTIAL-BIGINT-LIN (both soft and hard constraints, big integers, linear constraints) |
Best result obtained on this benchmark | MSAT TO |
Best cost obtained on this benchmark | 37 |
Best CPU time to get the best result obtained on this benchmark | 1800.4 |
Max-Satisfiable | |
Max-(Un)Satisfiability was proved | |
Best value of the cost | |
Optimality of the best cost was proved | |
Number of variables | 20370 |
Total number of constraints | 1081113 |
Number of soft constraints | 1079076 |
Number of constraints which are clauses | 1079076 |
Number of constraints which are cardinality constraints (but not clauses) | 2037 |
Number of constraints which are nor clauses,nor cardinality constraints | 0 |
Minimum length of a constraint | 1 |
Maximum length of a constraint | 10 |
Top cost | 47 |
Min constraint cost | 1 |
Max constraint cost | 47 |
Sum of constraints costs | 50697528 |
Biggest number in a constraint | 2 |
Number of bits of the biggest number in a constraint | 2 |
Biggest sum of numbers in a constraint | 11 |
Number of bits of the biggest sum of numbers | 4 |
Number of products (including duplicates) | 0 |
Sum of products size (including duplicates) | 0 |
Number of different products | 0 |
Sum of products size | 0 |
Solver Name | TraceID | Answer | CPU time | Wall clock time |
---|---|---|---|---|
Sat4j Resolution 2011-06-08 (complete) | 3493008 | MSAT (TO) | 1800.4 | 1796.42 |
This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).
cost of falsified constraints: 37--too large--