Name | /PARTIAL-BIGINT-LIN/wcsp/warehouse/ normalized-capmq1_wcsp.wbo |
MD5SUM | e8bcb76dae4005526534cba50c92556d |
Bench Category | PARTIAL-BIGINT-LIN (both soft and hard constraints, big integers, linear constraints) |
Best result obtained on this benchmark | MSAT TO |
Best cost obtained on this benchmark | 3438412 |
Best CPU time to get the best result obtained on this benchmark | 1800.26 |
Max-Satisfiable | |
Max-(Un)Satisfiability was proved | |
Best value of the cost | |
Optimality of the best cost was proved | |
Number of variables | 90600 |
Total number of constraints | 180900 |
Number of soft constraints | 180300 |
Number of constraints which are clauses | 180300 |
Number of constraints which are cardinality constraints (but not clauses) | 600 |
Number of constraints which are nor clauses,nor cardinality constraints | 0 |
Minimum length of a constraint | 1 |
Maximum length of a constraint | 300 |
Top cost | 167360670 |
Min constraint cost | 1 |
Max constraint cost | 167360670 |
Sum of constraints costs | 15063769612171 |
Biggest number in a constraint | 1 |
Number of bits of the biggest number in a constraint | 1 |
Biggest sum of numbers in a constraint | 301 |
Number of bits of the biggest sum of numbers | 9 |
Number of products (including duplicates) | 0 |
Sum of products size (including duplicates) | 0 |
Number of different products | 0 |
Sum of products size | 0 |
Solver Name | TraceID | Answer | CPU time | Wall clock time |
---|---|---|---|---|
Sat4j Resolution 2011-06-08 (complete) | 3492919 | MSAT (TO) | 1800.26 | 1798.8 |
This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).
cost of falsified constraints: 3438412--too large--