PB'10 competition: WBO track: solvers results per benchmarks

Result page for benchmark
/PARTIAL-BIGINT-LIN/wcsp/pedigree/
normalized-sheep4nr_wcsp.wbo

Jump to solvers results

General information on the benchmark

Name/PARTIAL-BIGINT-LIN/wcsp/pedigree/
normalized-sheep4nr_wcsp.wbo
MD5SUM838792388aba1cb33fb875c1c7fc5e90
Bench CategoryPARTIAL-BIGINT-LIN (both soft and hard constraints, big integers, linear constraints)
Best result obtained on this benchmark
Best cost obtained on this benchmark
Best CPU time to get the best result obtained on this benchmark
Max-Satisfiable
Max-(Un)Satisfiability was proved
Best value of the cost
Optimality of the best cost was proved
Number of variables89900
Total number of constraints5924003
Number of soft constraints5915013
Number of constraints which are clauses5915013
Number of constraints which are cardinality constraints (but not clauses)8990
Number of constraints which are nor clauses,nor cardinality constraints0
Minimum length of a constraint1
Maximum length of a constraint10
Top cost 2482
Min constraint cost 1
Max constraint cost 2482
Sum of constraints costs 14625664017
Biggest number in a constraint 2
Number of bits of the biggest number in a constraint 2
Biggest sum of numbers in a constraint 11
Number of bits of the biggest sum of numbers4
Number of products (including duplicates)0
Sum of products size (including duplicates)0
Number of different products0
Sum of products size0

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
SAT4J PB Resolution 2.2.1 (complete)2701658? 230.598 163.651
SAT4J PB RES // CP 2.2.0 2010-05-31 (complete)2701656? 322.503 290.522
SAT4J PB Resolution 2.2.0 2010-05-26 (complete)2701654? 599.759 556.681
SAT4J PB CuttingPlanes 2.2.0 2010-05-26 (complete)2701655? (exit code) 165.281 146.43
PB/CT 0.1 fixed (complete)2701659? (MO) 59.9729 60.0425
PB/CT 0.1 (complete)2701657? (TO) 1800.06 1800.02

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

cost of falsified constraints:
Solution found: