PB'10 competition: WBO track: solvers results per benchmarks

Result page for benchmark
/PARTIAL-BIGINT-LIN/PB06/web/uclid_pb_benchmarks/
normalized-blast-tlan3.ucl--soft-33-100-0.wbo

Jump to solvers results

General information on the benchmark

Name/PARTIAL-BIGINT-LIN/PB06/web/uclid_pb_benchmarks/
normalized-blast-tlan3.ucl--soft-33-100-0.wbo
MD5SUMbe4346b323e62d6c5200062c69540261
Bench CategoryPARTIAL-BIGINT-LIN (both soft and hard constraints, big integers, linear constraints)
Best result obtained on this benchmarkMOPT
Best cost obtained on this benchmark2
Best CPU time to get the best result obtained on this benchmark74.4547
Max-Satisfiable
Max-(Un)Satisfiability was proved
Best value of the cost
Optimality of the best cost was proved
Number of variables19944
Total number of constraints50842
Number of soft constraints34151
Number of constraints which are clauses43898
Number of constraints which are cardinality constraints (but not clauses)0
Number of constraints which are nor clauses,nor cardinality constraints6944
Minimum length of a constraint1
Maximum length of a constraint19
Top cost 1732165
Min constraint cost 1
Max constraint cost 100
Sum of constraints costs 1732164
Biggest number in a constraint 641
Number of bits of the biggest number in a constraint 10
Biggest sum of numbers in a constraint 2174
Number of bits of the biggest sum of numbers12
Number of products (including duplicates)0
Sum of products size (including duplicates)0
Number of different products0
Sum of products size0

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
SAT4J PB Resolution 2.2.1 (complete)2698007OPTIMUM 74.4547 75.0668
PB/CT 0.1 fixed (complete)2698748MSAT (TO) 1800.09 1800.04
PB/CT 0.1 (complete)2694966Signal 0.51992 0.519873
SAT4J PB Resolution 2.2.0 2010-05-26 (complete)2690823Wrong Opt. 34.1508 31.2088
SAT4J PB RES // CP 2.2.0 2010-05-31 (complete)2694225Wrong Opt. 163.977 155.07
SAT4J PB CuttingPlanes 2.2.0 2010-05-26 (complete)2691564Wrong Opt. 1350.22 1330.52

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

cost of falsified constraints: 2
Solution found:
--too large--