MAX-CSP 2008 Competition: solvers results per benchmarks

Result page for benchmark
maxcsp/celar/subs7/
normalized-scenw-7-sub0_ext.xml

Jump to solvers results

General information on the benchmark

Namemaxcsp/celar/subs7/
normalized-scenw-7-sub0_ext.xml
MD5SUMcca6bdca35415fdd8f7e53015cbfa2a6
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkMOPT
Best Number of falsified constraints4
Best CPU time to get the best result obtained on this benchmark0.127979
Satisfiable
(Un)Satisfiability was proved
Number of variables16
Number of constraints188
Maximum constraint arity2
Maximum domain size44
Number of constraints which are defined in extension188
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerNumber of falsified constraintsCPU timeWall clock time
toulbar2 2008-06-271125326OPTIMUM4 0.127979 0.131612
toulbar2/BTD 2008-06-271125325OPTIMUM4 0.877866 0.887282
Sugar v1.13+minisat1125324OPTIMUM4 14.7608 15.0012
Sugar++ v1.13+minisat-inc1125323OPTIMUM4 75.8245 76.0218
AbsconMax 112 pc-w1125321OPTIMUM4 1014.55 2551.24
AbsconMax 112 pc-d1125322MSAT (TO)4 1574.02 4000.07
Concrete + CSP4J - Tabu Engine 2008-05-301125320MSAT (TO)4 3600.05 3632.02
Concrete + CSP4J - MCRW Engine 2008-05-301125319MSAT (TO)4 3600.06 3634.42

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Number of falsified constraints: 4
Solution found:
16 33 40 0 22 32 14 32 26 31 0 35 25 20 19 11