MAX-CSP 2008 Competition: solvers results per benchmarks

Result page for benchmark
maxcsp/celar/scens/
normalized-scenw-06-22_ext.xml

Jump to solvers results

General information on the benchmark

Namemaxcsp/celar/scens/
normalized-scenw-06-22_ext.xml
MD5SUM00621646c81f1cc9daed991163bba876
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkMOPT
Best Number of falsified constraints22
Best CPU time to get the best result obtained on this benchmark7.60484
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints1210
Maximum constraint arity2
Maximum domain size22
Number of constraints which are defined in extension1210
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerNumber of falsified constraintsCPU timeWall clock time
toulbar2/BTD 2008-06-271125269OPTIMUM22 5.75312 5.81932
toulbar2 2008-06-271125270OPTIMUM22 7.60484 7.68387
AbsconMax 112 pc-w1125265MSAT (TO)22 1587.48 4000.06
AbsconMax 112 pc-d1125266MSAT (TO)22 1595.69 4000.05
Concrete + CSP4J - MCRW Engine 2008-05-301125263MSAT (TO)22 3600.08 3628.42
Concrete + CSP4J - Tabu Engine 2008-05-301125264MSAT (TO)28 3600.07 3619.82
Sugar v1.13+minisat1125268MSAT (TO)124 3600.03 3630.95
Sugar++ v1.13+minisat-inc1125267MSAT (TO)163 3600.13 3631.66

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Number of falsified constraints: 22
Solution found:
16 20 20 4 20 20 20 0 0 16 0 18 21 3 3 17 7 1 4 5 10 10 8 12 6 4 13 21 9 0 13 15 0 12 9 13 10 4 8 0 1 7 6 2 11 6 5 7 14 11 11 12 13 0 7 0 13
0 14 19 6 5 5 3 15 4 19 7 3 2 2 12 8 8 8 0 13 0 10 0 3 5 16 9 13 0 10 8 14 11 9 14 11 0 12 15 8 3 6 -1