MAX-CSP 2008 Competition: solvers results per benchmarks

Result page for benchmark
maxcsp/randomMaxCSP/completeLoose/
normalized-vcsp-25-10-100-18-25_ext.xml

Jump to solvers results

General information on the benchmark

Namemaxcsp/randomMaxCSP/completeLoose/
normalized-vcsp-25-10-100-18-25_ext.xml
MD5SUM0a952ad9d3f48d706fc5231b2ede8fcc
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkMOPT
Best Number of falsified constraints1
Best CPU time to get the best result obtained on this benchmark74.3987
Satisfiable
(Un)Satisfiability was proved
Number of variables25
Number of constraints300
Maximum constraint arity2
Maximum domain size10
Number of constraints which are defined in extension300
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerNumber of falsified constraintsCPU timeWall clock time
toulbar2/BTD 2008-06-271117621OPTIMUM1 49.7854 49.9937
Sugar v1.13+minisat1117620OPTIMUM1 74.3987 78.4
toulbar2 2008-06-271117622OPTIMUM1 88.5035 89.2641
Sugar++ v1.13+minisat-inc1117619OPTIMUM1 455.526 458.125
AbsconMax 112 pc-d1117618OPTIMUM1 640.39 1597.79
AbsconMax 112 pc-w1117617OPTIMUM1 805.065 1972.53
Concrete + CSP4J - Tabu Engine 2008-05-301117616MSAT (TO)1 3600.03 3610.62
Concrete + CSP4J - MCRW Engine 2008-05-301117615MSAT (TO)1 3600.09 3601.62

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Number of falsified constraints: 1
Solution found:
6 4 8 7 6 6 5 4 4 3 1 5 4 7 6 3 2 7 5 6 4 1 6 0 7