MAX-CSP 2008 Competition: solvers results per benchmarks

Result page for benchmark
maxcsp/randomMaxCSP/completeLoose/
normalized-vcsp-25-10-100-18-46_ext.xml

Jump to solvers results

General information on the benchmark

Namemaxcsp/randomMaxCSP/completeLoose/
normalized-vcsp-25-10-100-18-46_ext.xml
MD5SUMbbcb1a8bfacc80750750f5a7ca595433
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkMOPT
Best Number of falsified constraints2
Best CPU time to get the best result obtained on this benchmark94.8816
Satisfiable
(Un)Satisfiability was proved
Number of variables25
Number of constraints300
Maximum constraint arity2
Maximum domain size10
Number of constraints which are defined in extension300
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerNumber of falsified constraintsCPU timeWall clock time
toulbar2 2008-06-271117606OPTIMUM2 94.8816 95.2625
toulbar2/BTD 2008-06-271117605OPTIMUM2 98.347 99.201
Sugar v1.13+minisat1117604OPTIMUM2 280.165 283.223
Sugar++ v1.13+minisat-inc1117603OPTIMUM2 489.957 492.684
AbsconMax 112 pc-w1117601MSAT (TO)2 1582.65 4000.05
AbsconMax 112 pc-d1117602MSAT (TO)2 1600.11 4000.09
Concrete + CSP4J - Tabu Engine 2008-05-301117600MSAT (TO)2 3600.04 3632.23
Concrete + CSP4J - MCRW Engine 2008-05-301117599MSAT (TO)2 3600.05 3620.62

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Number of falsified constraints: 2
Solution found:
0 6 3 7 5 2 8 3 2 5 8 0 1 2 0 4 8 6 7 5 9 6 8 4 4