MAX-CSP 2008 Competition: solvers results per benchmarks

Result page for benchmark
maxcsp/randomMaxCSP/sparseTight/
normalized-vcsp-25-10-21-85-35_ext.xml

Jump to solvers results

General information on the benchmark

Namemaxcsp/randomMaxCSP/sparseTight/
normalized-vcsp-25-10-21-85-35_ext.xml
MD5SUMf94f45b3262ccf7f5788bddde0dc1a31
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkMOPT
Best Number of falsified constraints19
Best CPU time to get the best result obtained on this benchmark0.194969
Satisfiable
(Un)Satisfiability was proved
Number of variables25
Number of constraints63
Maximum constraint arity2
Maximum domain size10
Number of constraints which are defined in extension63
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerNumber of falsified constraintsCPU timeWall clock time
toulbar2 2008-06-271116294OPTIMUM19 0.194969 0.201063
toulbar2/BTD 2008-06-271116293OPTIMUM19 0.239963 0.245965
Sugar v1.13+minisat1116292OPTIMUM19 1194.15 1200.72
Sugar++ v1.13+minisat-inc1116291OPTIMUM19 1403.27 1416.52
AbsconMax 112 pc-d1116290MSAT (TO)19 1573.85 4000.06
AbsconMax 112 pc-w1116289MSAT (TO)19 1578.14 4000.06
Concrete + CSP4J - Tabu Engine 2008-05-301116288MSAT (TO)19 3600.01 3622.92
Concrete + CSP4J - MCRW Engine 2008-05-301116287MSAT (TO)19 3600.07 3633.92

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Number of falsified constraints: 19
Solution found:
8 7 2 1 4 2 5 0 8 0 9 8 4 0 0 4 6 6 5 8 1 8 8 9 7