MAX-CSP 2008 Competition: solvers results per benchmarks

Result page for benchmark
csp/geom/
normalized-geo50-20-d4-75-94_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/geom/
normalized-geo50-20-d4-75-94_ext.xml
MD5SUMedcea5f07ea32046e9d2a4753997c78c
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkMOPT
Best Number of falsified constraints1
Best CPU time to get the best result obtained on this benchmark2133.04
Satisfiable
(Un)Satisfiability was proved
Number of variables50
Number of constraints496
Maximum constraint arity2
Maximum domain size20
Number of constraints which are defined in extension496
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerNumber of falsified constraintsCPU timeWall clock time
toulbar2/BTD 2008-06-271114181OPTIMUM1 1248.53 1253.52
toulbar2 2008-06-271114182OPTIMUM1 2133.04 2136.76
Concrete + CSP4J - Tabu Engine 2008-05-301114176MSAT (TO)1 3600.02 3601.52
Concrete + CSP4J - MCRW Engine 2008-05-301114175MSAT (TO)1 3600.06 3625.53
AbsconMax 112 pc-d1114178MSAT (TO)2 1571.64 4000.06
AbsconMax 112 pc-w1114177MSAT (TO)2 1595.71 4000.04
Sugar v1.13+minisat1114180MSAT (TO)3 3600.05 3612.32
Sugar++ v1.13+minisat-inc1114179MSAT (TO)27 3600.13 3634.44

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Number of falsified constraints: 1
Solution found:
18 1 18 17 8 13 10 3 7 2 3 11 8 3 1 2 18 7 7 10 3 18 19 20 15 13 19 4 8 7 15 6 3 9 1 16 17 13 17 16 2 11 16 11 6 7 8 6 15 9