MAX-CSP 2008 Competition: solvers results per benchmarks

Result page for benchmark
csp/dag-rand/
normalized-rand-n23-d3-e16-r15-t150000-25.xml

Jump to solvers results

General information on the benchmark

Namecsp/dag-rand/
normalized-rand-n23-d3-e16-r15-t150000-25.xml
MD5SUM89e0232b0c166b071483c580fdb62237
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkMSAT TO
Best Number of falsified constraints9
Best CPU time to get the best result obtained on this benchmark3600.03
Satisfiable
(Un)Satisfiability was proved
Number of variables23
Number of constraints16
Maximum constraint arity15
Maximum domain size3
Number of constraints which are defined in extension16
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerNumber of falsified constraintsCPU timeWall clock time
Concrete + CSP4J - MCRW Engine 2008-05-301114029MSAT (TO)9 3600.03 3632.92
Concrete + CSP4J - Tabu Engine 2008-05-301114030MSAT (TO)9 3600.07 3608.22
AbsconMax 112 pc-w1114031MSAT (TO)10 3600.15 3611.22
AbsconMax 112 pc-d1114032MSAT (TO)10 3600.17 3629.25
toulbar2/BTD 2008-06-271114035? (TO)9 3600.07 3613.21
Sugar++ v1.13+minisat-inc1114033? (MO) 23.3814 26.4117
Sugar v1.13+minisat1114034? (MO) 23.43 23.8446
toulbar2 2008-06-271114036? (TO) 3600.1 3611.22

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Number of falsified constraints: 9
Solution found:
1 2 2 2 2 1 2 2 1 1 0 2 0 1 0 1 1 0 2 1 2 0 1