MAX-CSP 2008 Competition: solvers results per benchmarks

Result page for benchmark
csp/modifiedRenault/
normalized-renault-mod-1_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/modifiedRenault/
normalized-renault-mod-1_ext.xml
MD5SUM0a7786cb066bb1931619ce1947242042
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkMOPT
Best Number of falsified constraints1
Best CPU time to get the best result obtained on this benchmark8.82266
Satisfiable
(Un)Satisfiability was proved
Number of variables111
Number of constraints147
Maximum constraint arity10
Maximum domain size42
Number of constraints which are defined in extension147
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerNumber of falsified constraintsCPU timeWall clock time
toulbar2 2008-06-271111328OPTIMUM1 2.16067 2.18896
Sugar++ v1.13+minisat-inc1111325OPTIMUM1 8.82266 9.11165
Sugar v1.13+minisat1111326OPTIMUM1 9.12061 9.41637
toulbar2/BTD 2008-06-271111327OPTIMUM1 10.1105 10.204
AbsconMax 112 pc-d1111324OPTIMUM1 731.303 773.198
AbsconMax 112 pc-w1111323OPTIMUM1 1206.97 1224.01
Concrete + CSP4J - MCRW Engine 2008-05-301111321MSAT (TO)1 3600.02 3601.52
Concrete + CSP4J - Tabu Engine 2008-05-301111322MSAT (TO)1 3600.03 3610.42

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Number of falsified constraints: 1
Solution found:
0 1 6 9 0 0 0 3 0 1 1 0 0 2 1 0 0 0 1 2 2 1 1 1 10 0 3 0 0 0 1 0 3 19 0 1 2 0 1 2 0 0 0 1 2 0 0 0 0 0 1 1 1 1 1 8 1 0 0 0 0 1 2 0 0 2 2 0 1
2 0 9 2 2 3 0 0 0 0 1 1 0 4 0 0 1 1 0 0 0 0 0 0 0 0 3 2 4 0 0 0 1 4 1 2 5 4 4 0 0 5