MAX-CSP 2008 Competition: solvers results per benchmarks

Result page for benchmark
csp/BH-4-7/
normalized-BlackHole-4-7-e-4_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/BH-4-7/
normalized-BlackHole-4-7-e-4_ext.xml
MD5SUM5af9256d6bcac31317b3bfaaca55fb19
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkMOPT
Best Number of falsified constraints1
Best CPU time to get the best result obtained on this benchmark3054.09
Satisfiable
(Un)Satisfiability was proved
Number of variables112
Number of constraints1261
Maximum constraint arity2
Maximum domain size28
Number of constraints which are defined in extension1261
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerNumber of falsified constraintsCPU timeWall clock time
Sugar++ v1.13+minisat-inc1108107OPTIMUM1 3054.09 3083.16
AbsconMax 112 pc-w1108105MSAT (TO)1 1588.52 4000.35
AbsconMax 112 pc-d1108106MSAT (TO)1 1596.33 4000.34
Concrete + CSP4J - MCRW Engine 2008-05-301108103MSAT (TO)1 3600.08 3627.32
Concrete + CSP4J - Tabu Engine 2008-05-301108104MSAT (TO)1 3600.09 3632.42
Sugar v1.13+minisat1108108MSAT (TO)2 3600.08 3631.55
toulbar2 2008-06-271108110? (TO) 3600.03 3610.71
toulbar2/BTD 2008-06-271108109? (TO) 3600.13 3617.11

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Number of falsified constraints: 1
Solution found:
0 0 0 8 26 1 21 27 0 13 26 6 14 26 0 6 27 6 26 27 5 18 25 4 19 26 5 27 26 6 12 26 5 20 25 6 7 25 0 20 27 6 5 25 5 25 26 4 24 27 3 4 25 4 10
26 3 11 25 4 3 27 3 16 25 2 22 27 1 2 27 2 17 25 3 9 27 2 15 26 1 23 25 2 14 2 3 1 14 1 13 11 10 12 13 12 14 1 13 11 9 8 9 8 9 7 5 4 6 7 5 4