MAX-CSP 2006 Competition: solvers results per benchmarks

Result page for benchmark
pseudoSeries/mpsReduced/
mps-red-blend.xml

Jump to solvers results

General information on the benchmark

NamepseudoSeries/mpsReduced/
mps-red-blend.xml
MD5SUM91e806d7c4e258711c35649d1f35ecf1
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkMSAT TO
Best Number of satisfied constraints73
Best CPU time to get the best result obtained on this benchmark2400.06
SatisfiableNO
(Un)Satisfiability was provedNO
Number of variables2490
Number of constraints117
Maximum constraint arity780
Maximum domain size2
Number of constraints which are defined in extension0
Number of constraints which are defined in intension117
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
AbsconMax 109 PFC275769MSAT (TO) 2400.06 2419.86
AbsconMax 109 EPFC275768MSAT (TO) 2400.07 2408.85
CSP4J - MaxCSP 2006-12-19275767? (TO) 0.004998 2403.03