CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
taillard/os-taillard-5/
os-taillard-5-100-7.xml

Jump to solvers results

General information on the benchmark

Nametaillard/os-taillard-5/
os-taillard-5-100-7.xml
MD5SUMd5081a0ba82d7a928e9ef02f0cd66b7c
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.100984
SatisfiableYES
(Un)Satisfiability was provedYES
Number of variables25
Number of constraints100
Maximum constraint arity2
Maximum domain size297
Number of constraints which are defined in extension0
Number of constraints which are defined in intension100
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Tramontane 2006-12-04234810SAT 0.100984 0.103114
sugar 0.40234811SAT 0.92 1.13729
Mistral 2006-12-04234809SAT 1.53477 1.54748
buggy_2_5 2007-01-08234808SAT 4.95725 5.02794
buggy_2_5_s 2007-01-08234807SAT 8.22775 8.26456
CSP4J - MAC 2007-01-16272269SAT 92.041 92.0997
Abscon 109 ESAC234799SAT 176.43 178.139
Abscon 109 AC234800SAT 185.062 186.974
SAT4JCSP-CACHED 1.7 RC BF3234805SAT 562.298 564.362
sat4jCSP 1.7 RC BF3234806SAT 1260.03 1249.18
galac 1234803? (MO) 0 638.375
galacJ beta 1234798? (TO) 0.025995 1810.81
CSP4J - Combo 2006-12-19234801? (TO) 1800.06 1815.45
CSP4J - MAC 2006-12-19234802? (TO) 1800.07 1800.67
BPrologCSPSolver70a 2006-12-13234797? (TO) 1800.07 1810.26
VALCSP 3.1269477? (TO) 1800.08 1801.39
CSPtoSAT+minisat 0.3234812? (TO) 1800.08 1809.75
VALCSP 3.0234804? (TO) 1800.09 1812.13