CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
queens/
queens-180.xml

Jump to solvers results

General information on the benchmark

Namequeens/
queens-180.xml
MD5SUMc796a276961c748e1ef388ea91350f5c
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark4.35734
SatisfiableYES
(Un)Satisfiability was provedYES
Number of variables180
Number of constraints16110
Maximum constraint arity2
Maximum domain size180
Number of constraints which are defined in extension0
Number of constraints which are defined in intension16110
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Tramontane 2006-12-04192100SAT 4.35734 4.3627
Abscon 109 ESAC192089SAT 6.98994 7.09515
Abscon 109 AC192090SAT 7.10992 7.18261
buggy_2_5 2007-01-08192098SAT 9.71552 10.0507
buggy_2_5_s 2007-01-08192097SAT 32.3241 32.4264
galacJ beta 1192088SAT 63.0314 63.1268
galac 1192093SAT 244.669 246.158
sat4jCSP 1.7 RC BF3192096? 613.768 615.971
SAT4JCSP-CACHED 1.7 RC BF3192095? (exit code) 96.8443 96.7428
VALCSP 3.0192094? (MO) 67.2318 67.2561
VALCSP 3.1267817? (MO) 67.7867 68.1479
CSP4J - MAC 2007-01-16269776? (TO) 0.003998 1802.07
CSP4J - Combo 2006-12-19192091? (TO) 1800.03 1808.54
CSP4J - MAC 2006-12-19192092? (TO) 1800.05 1801.23
Mistral 2006-12-04192099? (TO) 1800.09 1806.13
BPrologCSPSolver70a 2006-12-13192087? (TO) 1800.09 1801.18
CSPtoSAT+minisat 0.3192102? (TO) 1800.09 1800.73
sugar 0.40192101? (TO) 1803.6 1876.95