CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
primes/primes-20/
primes-20-40-3-5.xml

Jump to solvers results

General information on the benchmark

Nameprimes/primes-20/
primes-20-40-3-5.xml
MD5SUM81386ab22975c7dcf2626924b40893ff
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmark
Best CPU time to get the best result obtained on this benchmark
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints40
Maximum constraint arity8
Maximum domain size70
Number of constraints which are defined in extension0
Number of constraints which are defined in intension40
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
SAT4JCSP-CACHED 1.7 RC BF3249667? (MO) 43.2184 42.8088
sat4jCSP 1.7 RC BF3249668? (MO) 60.7448 58.4576
CSP4J - Combo 2006-12-19249664? (TO) 1800.01 1815.09
BPrologCSPSolver70a 2006-12-13249660? (TO) 1800.02 1801.09
CSP4J - MAC 2007-01-16273093? (TO) 1800.02 1804.55
CSP4J - MAC 2006-12-19249665? (TO) 1800.03 1800.5
galac 1249666? (TO) 1800.04 1808.88
galacJ beta 1249661? (TO) 1800.05 1807.22
Abscon 109 AC249663? (TO) 1800.06 1800.52
CSPtoSAT+minisat 0.3249672? (TO) 1800.1 1804.73
Abscon 109 ESAC249662? (TO) 1800.14 1800.6
sugar 0.40249671? (TO) 1804.39 2130.28
Mistral 2006-12-04249669Signal 0.026994 0.0283999
Tramontane 2006-12-04249670Signal 0.027995 0.0308511