CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
primes/primes-20/
primes-20-80-3-3.xml

Jump to solvers results

General information on the benchmark

Nameprimes/primes-20/
primes-20-80-3-3.xml
MD5SUM15d3d13ed971ab951114e8299b03c52e
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.042992
SatisfiableYES
(Un)Satisfiability was proved
Number of variables100
Number of constraints80
Maximum constraint arity6
Maximum domain size70
Number of constraints which are defined in extension0
Number of constraints which are defined in intension80
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
BPrologCSPSolver70a 2006-12-13249556SAT 0.042992 0.044385
Abscon 109 AC249559SAT 10.5924 10.7087
Abscon 109 ESAC249558SAT 11.9132 12.0097
CSP4J - MAC 2007-01-16273085SAT 1070.73 1071.27
SAT4JCSP-CACHED 1.7 RC BF3249563? (MO) 42.6585 42.3461
sat4jCSP 1.7 RC BF3249564? (MO) 74.9166 73.6978
CSP4J - MAC 2006-12-19249561? (TO) 0.004998 1801.33
CSP4J - Combo 2006-12-19249560? (TO) 1800.01 1816.56
galacJ beta 1249557? (TO) 1800.01 1800.73
galac 1249562? (TO) 1800.02 1814.92
CSPtoSAT+minisat 0.3249568? (TO) 1800.08 1800.82
sugar 0.40249567? (TO) 1801.68 1838.44
Tramontane 2006-12-04249566Signal 0.034994 0.036386
Mistral 2006-12-04249565Signal 0.035993 0.04504