CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
primes/primes-25/
primes-25-80-2-1.xml

Jump to solvers results

General information on the benchmark

Nameprimes/primes-25/
primes-25-80-2-1.xml
MD5SUM857559e77a6c7a2abb0ebfc12db4a447
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.024995
SatisfiableYES
(Un)Satisfiability was proved
Number of variables100
Number of constraints80
Maximum constraint arity3
Maximum domain size96
Number of constraints which are defined in extension0
Number of constraints which are defined in intension80
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
BPrologCSPSolver70a 2006-12-13248698SAT 0.024995 0.0313369
Abscon 109 AC248701SAT 1.90471 1.96113
Abscon 109 ESAC248700SAT 1.9597 2.02335
CSP4J - MAC 2007-01-16273019SAT 9.24259 9.35561
CSP4J - Combo 2006-12-19248702SAT 10.8943 11.1192
CSP4J - MAC 2006-12-19248703SAT 10.8953 11.0923
galacJ beta 1248699SAT 18.1622 18.3489
galac 1248704SAT 26.8699 27.1283
sugar 0.40248709? 341.57 349.522
SAT4JCSP-CACHED 1.7 RC BF3248705? (MO) 17.7943 16.805
sat4jCSP 1.7 RC BF3248706? (MO) 73.7158 70.4528
CSPtoSAT+minisat 0.3248710? (TO) 1800.06 1814.66
Mistral 2006-12-04248707Signal 0.026995 0.0347721
Tramontane 2006-12-04248708Signal 0.027995 0.0426561